Underground Power Cable Site Test after Installation



Underground Power Cable
High Voltage Cable Tester

 Site Test after Installation:



Site test after installation underground power cable is required to confirm that the cable are installed properly and there is no any damage during laying.


Following site test should carry out for underground cable after installation:


1. Phase Checking Test
2. 10 kV Sheath Integrity Test
3. Insulation Resistance Test
4. DC High Voltage Test
5. No load Test


For safe and effective energization of underground cable power line  site test after installation is necessary.





Comments

Popular posts from this blog

Star Delta Starter Line Diagram and Its Working Principle

ELECTRICAL DISTRIBUTION BOARD DB WIRING

EARTH ELECTRODE RESISTANCE MEASUREMENT

SURGE ARRESTERS SPECIFICATION FOR 132 KV & 33 KV LINE

Why Purge System Is Required For Refrigerant and How Does It Operate in Chiller Compressor

STEP AND TOUCH POTENTIAL: REDUCE ELECTRICAL HAZARD AND IMPROVE SAFETY AWARENESS

CURRENT TRANSFORMERS –CT USING

ভুমিকম্পের কল্প কথা

How Economizer Works in Centrifugal Chiller

wazipoint

DMCA protected

The content is copyright protected to wazipoint and may not be reproduced on other websites.