PLANT HANDOVER-TAKEOVER PROCEDURE AFTER ACHIEVEMENT

Handover a Project

The Handover-Takeover Procedure after Achievement a Turnkey Project


The article furnished to prepare a project for final tusk just turn the key from service-provider to employer, after completion the all work to able the plant run successfully. Here denoted the procedure- commissioning the plant after finishing all physical works, the guideline for responsibility of any defect after handing over the plant and final acceptance procedure of the project.

Plant Taking Over Conditions after Completion the Work

After satisfactory completion of the tests on commissioning, the Engineer will issue a taking over certificate for the plant. The issue of any such certificate shall not however relieve the Service-provider of any of his responsibilities in respect of proving that the performance of the plant meets the guaranteed values.

The Taking over certificate shall make reference to a schedule of outstanding minor defects and omissions which have been accepted by the Engineer as not affecting the full and safe operation of the plant. The Service-provider shall rectify such defects and omissions not later than 3 months after taking over.
The date certified in the taking over certificate shall be the date on which the tests on completion were completed.

Responsibility for Defect after Taking over the Plant

Accordance with the General Conditions of Contract, the service-provider shall be responsible for making good defects or damage which may appear or occur during a 12 month guarantee period from the date certified in the Taking over Certificate.
Following any remedial work or replacement of any component part during the 12 months, the guarantee period for such a part shall be extended, commencing from the date at which the remedial work was completed.
Immediately prior to the completion of this period the Employer reserves the right to request the Service-provider to open up for inspection the whole or any part of the Plant. The Employer will provide the labour to works under the direct supervision of the Service-provider’s representative for the purpose of such inspection.
The Service-provider shall submit for approval the arrangements he intends making under this contract for the making good of defects and for providing the supervisory service detailed above.

Final Acceptance and Taking over Certificate for the Project

Application for the Final Acceptance Certificate may be made to the Engineer after the Service-provider has ceased to the under any obligation under the contract. This shall include the submission of final contract record drawings and fully bound version of the Installation, operation and maintenance manuals. If a Taking over Certificate has been issued in respect of any section or portion of the works, only one Final Certificate will be issued after all the said obligation has ceased.
Final Certificate will be issued after all the said obligation has ceased. Where the Service-provider has carried out replacements or renewals to the Works, the Service-provider’s obligations shall continue, but the right of the Service-provider to apply for a Final Acceptance Certificate other than for the replacements or renewals shall not be affected by that fact.

Comments

Popular posts from this blog

Star Delta Starter Line Diagram and Its Working Principle

ELECTRICAL DISTRIBUTION BOARD DB WIRING

EARTH ELECTRODE RESISTANCE MEASUREMENT

SURGE ARRESTERS SPECIFICATION FOR 132 KV & 33 KV LINE

Why Purge System Is Required For Refrigerant and How Does It Operate in Chiller Compressor

ভুমিকম্পের কল্প কথা

STEP AND TOUCH POTENTIAL: REDUCE ELECTRICAL HAZARD AND IMPROVE SAFETY AWARENESS

CURRENT TRANSFORMERS –CT USING

MCB: MINIATURE CIRCUIT BREAKER OPERATION BASIC

wazipoint

DMCA protected

The content is copyright protected to wazipoint and may not be reproduced on other websites.