DIARIES IN SITE WORKS

How Maintain a Diary In Project Site Work

The Contractor shall provide suitable diaries in an approved form to which the Employer shall have access, and shall enter in these diaries all the measurements of the Contract Works on the Site as completed on the day on which the measurements are taken, together with full particulars, and details of all obstructions or modifications or extra, or incidents and the number of men employed in each of the several portions of the work in progress and any other information as directed by the Employer or his representative.

The diaries shall be available at all times for the Employer to verify the records, and the Employers representative shall sign all entries therein so verified, and have full liberty himself to make entries therein, but no such signature or entry shall imply acceptance of any work or material, or that the Contractor is entitled to be paid for the same, or at any particular rate. The diaries shall, when signed by both parties, be deemed to be a true record of the work executed. The diary(s) shall be the property of the Employer.

Comments

Popular posts from this blog

Star Delta Starter Line Diagram and Its Working Principle

ELECTRICAL DISTRIBUTION BOARD DB WIRING

SURGE ARRESTERS SPECIFICATION FOR 132 KV & 33 KV LINE

EARTH ELECTRODE RESISTANCE MEASUREMENT

MCB: MINIATURE CIRCUIT BREAKER OPERATION BASIC

CURRENT TRANSFORMERS –CT USING

ভুমিকম্পের কল্প কথা

Why Purge System Is Required For Refrigerant and How Does It Operate in Chiller Compressor

STEP AND TOUCH POTENTIAL: REDUCE ELECTRICAL HAZARD AND IMPROVE SAFETY AWARENESS

wazipoint

DMCA protected

The content is copyright protected to wazipoint and may not be reproduced on other websites.